top of page

SPEEDCAST

Technical Writing

When SpeedCast constructed the ground-based satellite infrastructure for the nbn™ Skymuster™ system they turned to Innovative Thinking (IT) to develop the technical and contract documentation for the $184m rollout.


The project included:

  • Document workflow analysis and improvement

  • System design documentation

  • System installation documentation

  • Site layouts and equipment specifications

  • Architectural analysis and drawings

  • As built drawings

  • Contract modifications

  • Development of regional testing processes

  • Data collection procedure and test result reporting

  • SOPs for a managed service


Innovative Thinking (IT) designed a document suite and a set of document management processes that improved documentation turnaround and speed of contract approval.

bottom of page